12-22-2010, 09:20 AM
11/16/2010 - (2000) Order Accepted by GM Dealer used allocation to place order into production
11/17/2010 - (2500) Order Preferenced Order pulled to the production system
11/17/2010 - (3000) Order accepted by production control. Parts being ordered and production process is underway.
11/30/2010 - (3300) Order Scheduled for Production Order is scheduled into the plant build cycle
11/30/2010 - (3100) Order available to sequence.
11/30/2010 - (3400) Order Broadcast (Internal Plant Paperwork Order Produced) Order is sent to various build & supplier areas to bring order together
I have a TPW of 12/15 and still nothing has happened. Is there a Black Hole next to area 51?:confused:
11/17/2010 - (2500) Order Preferenced Order pulled to the production system
11/17/2010 - (3000) Order accepted by production control. Parts being ordered and production process is underway.
11/30/2010 - (3300) Order Scheduled for Production Order is scheduled into the plant build cycle
11/30/2010 - (3100) Order available to sequence.
11/30/2010 - (3400) Order Broadcast (Internal Plant Paperwork Order Produced) Order is sent to various build & supplier areas to bring order together
I have a TPW of 12/15 and still nothing has happened. Is there a Black Hole next to area 51?:confused: